Paddington Central

We installed 9 lifts comprising of:

Group of 6, 5 x 10 floors and 1 x 12 floors scenic passenger lifts

2 x 11 floors fire fighting lifts

1 x 12 floors goods lift

LLIL labour started the hi-spec scenic installs in May 2007, also taking on 75% of the site management.

Installation of all auxiliary steel work was undertaken, including H Frames, steel work, canter lever brackets and re-drilled bracketry to grid lines.  All scenics and back of house lifts were installed to a very high quality standard.  The scenic motor-room was designed by Our consultant engineer.

We also assisted with the technical side of the DCS’s installation and grouping of the lifts.

This was a successful install and we met the partial completion date.